Conference Paper

The Performance of a New Hybrid PLL in an Interconnected Renewable Energy Systems under Fault Ride Through Operation

Figure 11

The settling time required from meas to track the refis lower using the FPNSC-d PLL system than using FPNSC-ddsrfPLL system.
168054.fig.0011