Conference Paper
The Performance of a New Hybrid PLL in an Interconnected Renewable Energy Systems under Fault Ride Through Operation
Figure 11
The settling time required from meas to track the refis lower using the FPNSC-dPLL system than using FPNSC-ddsrfPLL system.