741275.fig.001
Figure 1: The structure sketch of a periodically inspected system maintained through several minimal repairs before a replacement or a perfect repair, where “•” denotes the system failure, MR and PR denote minimal repair and perfect repair or replacement, respectively, and is prefixed as 2.