Research Article
Minimum Time Trajectory Optimization of CNC Machining with Tracking Error Constraints
Table 1
Performance comparison among MTT, SMTT, TEC-SMMT, and RTEC-SMTT for the ellipse path.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planning times in this table are obtained under the conditions of initial guess 0.001 and number of parameterized grids 200. ♢Since the RTEC-SMTT is hardly to be obtained, the planning time for this trajectory is only an estimate by repeated attempts. |