Table 1:
A comparison between the proposed approach, [
22
] and [
29
] for the same number of function evaluations in solving the problem of (
2
). The best results are indicated in boldface.
Best
Mean
Worst
Proposed approach
13.590846
13.61073
13.84861
[
29
]
13.59658
—
244.11616
[
22
]
13.59085
30.74880
152.54840