Table 2: Number of postdisturbance samples required for decision by NNPCA-based relay.

CasesNumber of samples required
(actual)
Maximum samples required
(Logical)

Magnetizing inrush ( 0 )812
Internal fault (5% to 98%)612
Internal fault (light phase-to-ground fault at 2%)912