Research Article
Optimizing Reservoir-Stream-Aquifer Interactions for Conjunctive Use and Hydropower Production
Table 2
Water demands in the study area.
| Water user | Characteristic | Source | Demand (m3/day) |
| Industry 1 | | Pumping well-1 | 1660 | Industry 2 | | Reservoir diversion | 1383 | Industry 3 | | Pumping well-2 | 4150 | Industry 4 | | Stream diversion-2 | 1245 | Irrigated area | 650,000 m2 | Stream diversion-1 | 3873 | Town | 600 persons | Pumping well-2 and reservoir diversion | 180 |
|
|