Increasing the Capacity of Existing Bridges by Using Unbonded Prestressing Technology: A Case Study
Figure 1
Longitudinal section of (a) existing bridge, (b) demolition of gravel-grate walls and elimination of road superstructure, (c) realization of a new deck, and (d) realization of new gravel-grate walls and a system of external prestressing.