Research Article

Comparison of Fuzzy AHP and Fuzzy TOPSIS for Road Pavement Maintenance Prioritization: Methodological Exposition and Case Study

Table 1

Road condition survey data showing pavement segment chainage and the observed distresses, as derived from the PQI calculations.

Segment or chainage (m)Observed distresses

0–300(i) Potholes 
(ii) Longitudinal cracks 
(iii) Transverse cracks 
(iv) Alligator cracks

300–600(i) Longitudinal cracks 
(ii) Transverse cracks 
(iii) Block cracking

600–900(i) Potholes 
(ii) Longitudinal cracks 
(iii) Transverse cracks 
(iv) Alligator cracks 
(v) Patching

900–1 200(i) Potholes 
(ii) Longitudinal cracks 
(iii) Alligator cracks

1 200–1 500(i) Potholes 
(ii) Longitudinal cracks 
(iii) Edge cracking 
(iv) Raveling

1 500–1 800(i) Potholes 
(ii) Longitudinal cracks 
(iii) Transverse cracks 
(iv) Block cracking

1 800–2 100(i) Potholes 
(ii) Longitudinal cracks 
(iii) Alligator cracks

2 100–2 400(i) Potholes 
(ii) Longitudinal cracks 
(iii) Transverse cracks 
(iv) Block cracking

2 400–2 700(i) Potholes 
(ii) Longitudinal cracks 
(iii) Alligator cracks

2 700–3 000(i) Potholes 
(ii) Longitudinal cracks 
(iii) Transverse cracks 
(iv) Alligator cracks 
(v) Block cracking 
(vi) Raveling