Research Article
Comparison of Fuzzy AHP and Fuzzy TOPSIS for Road Pavement Maintenance Prioritization: Methodological Exposition and Case Study
Table 6
Round 2 of judgment based on incremental linear ranking with 1.0 as the lowest importance.
| Road pavement maintenance objectives | Pavement expert (engineer/inspector/planner) | Maintenance relative weights based on linear scale | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
| Road safety | 3 | 4 | 5 | 5 | 4 | 2 | 2 | 2.5 | 4 | 4 | 0.36 | Pavement surface preservation | 2.5 | 3 | 3 | 4 | 4 | 3 | 2 | 4 | 3 | 2 | 0.30 | Road operational status and standards | 2 | 3 | 3 | 4 | 3 | 1.5 | 2 | 3 | 3 | 1 | 0.25 | Road aesthetics | 1 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | 1 | 1 | 0.12 |
|
|