Research Article

Effects of Water Inrush from Tunnel Excavation Face on the Deformation and Mechanical Performance of Shield Tunnel Segment Joints

Figure 13

The effect of water head difference on the maximum tensile stress of segment. Water head difference of (a) 18 m and (b) 0 m.
(a)
(b)