Research Article

Experimental Investigation on Seepage Stability of Filling Material of Karst Collapse Pillar in Mining Engineering

Table 2

The seepage property parameters.

SpecimenInitial porosityInitial permeability k0 (10−14 m2)Stable permeability ks (10−14 m2)Seepage instability duration T(s)

With clay0.112.83278
0.134.64180
0.157.8077
0.1714.3834

With gypsum0.111.850.49
0.133.101.09
0.153.695996
0.174.994003

With cement0.111.700.13
0.132.180.29
0.152.650.44
0.174.891.11