Research Article

Probability-Based Sensitivity of Service Life of Chloride-Attacked Concrete Structures with Multiple Cover Concrete Repairs

Figure 4

Deterministic space-dependent chloride profiles with S1, S4, and S6. (a) Year 1 to year 30B. (b) Year 30A to year 45 (with S1). (c) Year 30A to year 45 (with S4). (d) Year 30A to year 45 (with S6).
(a)
(b)
(c)
(d)