Research Article

Political Risk Paths in International Construction Projects: Case Study from Chinese Construction Enterprises

Table 3

Measurement model evaluation.

FactorsFactor loadingR2CRAVE

A10.7120.507
A20.7510.564
A30.8160.513
0.8040.579

B10.8270.684
B20.7520.566
B30.8700.757
B40.7810.610
0.8830.654

C10.8130.564
C20.8170.513
C30.9030.815
C40.7350.540
0.8900.671

D10.7560.572
D20.8460.716
D30.9120.832
D40.8870.787
0.9140.726

E10.7740.599
E20.8210.674
E30.8430.711
0.8540.661

F10.8250.681
F20.7770.604
F30.7560.572
0.8290.619

G10.8550.731
G20.7320.536
G30.8210.674
0.8460.647

H10.8110.658
H20.7920.627
H30.8660.750
0.8630.678

I10.7830.613
I20.8990.808
I30.8360.699
0.8780.707