Integration of BIM and Energy Consumption Modelling for Manufacturing Prefabricated Components: A Case Study in China
Table 6
Prefabricated components information.
| Type | Maximum weight (t) | Building number | Total | 1 | 2-1 | 2-3 | 3 | 4 | 6 | 7 | 8 | 9 |
| Beams | 4.10 | 194 | 211 | 293 | 211 | 335 | 298 | 266 | 447 | 520 | 2775 | Slabs | 1.66 | 400 | 408 | 505 | 409 | 536 | 510 | 525 | 676 | 851 | 4820 | Columns | 2.73 | 44 | 84 | 100 | 84 | 124 | 96 | 104 | 92 | 116 | 844 | Total | ā | 638 | 703 | 898 | 704 | 995 | 904 | 895 | 1215 | 1487 | 8439 |
|
|