Research Article

Shield Equipment Optimization and Construction Control Technology in Water-Rich and Sandy Cobble Stratum: A Case Study of the First Yellow River Metro Tunnel Undercrossing

Figure 8

Diagram showing the adjusting device that controls the opening rate and position of the cutter head.
(a)
(b)