Research Article
Shield Equipment Optimization and Construction Control Technology in Water-Rich and Sandy Cobble Stratum: A Case Study of the First Yellow River Metro Tunnel Undercrossing
Figure 8
Diagram showing the adjusting device that controls the opening rate and position of the cutter head.
(a) |
(b) |