Research Article

Neural Network-Based Model for Predicting Preliminary Construction Cost as Part of Cost Predicting System

Table 3

Importance of the variables.

Overall importance of variables
VariableImportance

ln (planned costs, €)100.000
Purpose of the facility0.377
ln (planned time, days)0.069
ln (real time, days)0.042