Research and Analysis on the Influence of Small Clear Distance Drilling and Blasting Method on the Existing Tunnel Structure

Table 3

Maximum closing speed of each monitoring point.

Excavation depth (m)Resultant velocity (cm/s)
19111089851970487

542.273.871.680.490.35
602.543.913.610.830.35
781.392.9411.283.111.15
840.821.7810.723.491.67
900.681.295.893.311.97
Maximum2.543.9111.283.491.97