To what extent are the following indicators considered and implemented in this design? | Scale | Total points | Scores gained | Cluster Wms (%) | Group Wms (%) |
0 not implemented 3 considered 5 highly implemented | Weight |
|
Financial performance 19.07% | OPEX | VFI11 | Maximise residual value | 1.83 | 2 | 19 | 3.66 | 76.17 | 72.15 |
VFI6 | Increase economic lifetime | 1.96 | 4 | 7.85 |
VFI15 | Optimise risk-return ratio of alternative options | 1.82 | 5 | 9.10 |
VFI2 | Efficiency of operational expenditure (OPEX) | 1.99 | 4 | 7.95 |
VFI5 | Improve economic efficiency | 2.00 | 4 | 8.00 |
CAPEX | VFI3 | Maximise the cost efficiency to build | 1.89 | 4 | 17 | 7.56 | 68.13 |
VFI1 | Efficiency of capital expenditure (CAPEX) | 1.99 | 4 | 7.97 |
VFI12 | Minimise cost of capital | 1.87 | 2 | 3.74 |
VFI4 | Deliver/achieve cost certainty | 1.88 | 3 | 5.63 |
VFI9 | Return on investment | 1.84 | 4 | 7.35 |
|
Functional performance 35.49% | Longevity | VFU26 | Provide functional ability of the foundation’s requirements (strength and stability) | 1.92 | 3 | 27 | 5.74 | 77.42 | 79.64 |
VFU27 | Ensure substructure functional requirements meet a satisfactory level of performance | 1.91 | 3 | 5.73 |
VFU28 | Ensure superstructure functional requirements meet a satisfactory level of performance | 1.92 | 4 | 7.68 |
VFU2 | Increase life of services | 2.04 | 4 | 8.16 |
VFU3 | Provide function-fitness for purpose | 2.04 | 5 | 10.2 |
VFU23 | Configure design to enable an efficient construction process | 2.00 | 4 | 8.02 |
VFU24 | Ensure construction efficiency is considered in specification | 1.97 | 4 | 7.87 |
Reliability | VFU19 | Maintain security-health and safety | 1.93 | 3 | 45 | 5.79 | 81.87 |
VFU21 | Meet all statutory requirements and building regulations | 1.97 | 4 | 7.89 |
VFU22 | Ensure designed elements are standardised | 2.05 | 4 | 8.21 |
VFU20 | Suitability and maintainability of materials | 2.03 | 4 | 8.14 |
VFU15 | Provide durable building-last longer | 1.93 | 4 | 7.72 |
VFU14 | Assure convenience | 1.99 | 5 | 9.93 |
VFU18 | Create reliable building-safer | 1.97 | 4 | 7.89 |
VFU1 | Maintain adaptable building-useful to all | 2.00 | 4 | 8.02 |
VFU8 | Increase efficiency-add capacity | 1.91 | 4 | 7.64 |
VFU13 | Provide disability access | 1.97 | 5 | 9.84 |
VFU16 | Maintain durability | 1.93 | 4 | 7.70 |
|
Operational performance 17.66% | Manageability | VOP8 | Easy to operate | 1.92 | 4 | 19 | 7.68 | 76.03 | 70.59 |
VOP6 | Easy to maintain | 1.91 | 4 | 7.62 |
VOP9 | Easy to inspect and maintain | 1.90 | 3 | 5.69 |
VOP11 | Provide building systems that are easy to operate and control | 1.91 | 4 | 7.62 |
VOP15 | Reduce operational risk | 1.92 | 4 | 7.68 |
Energy and efficiency | VOP1 | Reduce/minimise/save energy usage | 2.09 | 4 | 13 | 8.35 | 65.14 |
VOP2 | Maintain efficiency in terms of energy | 2.12 | 3 | 6.36 |
VOP3 | Increase efficiency of utilities | 1.94 | 3 | 5.83 |
VOP4 | Increase efficiency of heating, cooling, and lighting | 1.96 | 3 | 5.89 |
|
Environmental performance 15.66% | Ecoresources | VEN5 | Increase use of natural ventilation | 1.98 | 4 | 16 | 7.93 | 63.9 | 55.4 |
VEN3 | Provide indoor environmental quality | 1.98 | 4 | 7.93 |
VEN4 | Access to natural light, management of air quality, and temperature | 2.03 | 2 | 4.07 |
VEN7 | Specifying low-maintenance, durable, environmentally preferable materials, and equipment | 1.99 | 3 | 5.94 |
VEN10 | Minimise consumption of resources | 1.91 | 3 | 5.73 |
Adaptability | VEN8 | Maximise resource reuse | 1.89 | 2 | 7 | 3.78 | 46.91 |
VEN12 | Respond to site microclimate | 1.88 | 2 | 3.76 |
VEN11 | Conserve water resources | 1.99 | 3 | 5.97 |
|
Management performance 12.12% | Control | VMA10 | Able to construct to scope/cost/budget/schedule/quality | 1.97 | 4 | 11 | 7.89 | 73.32 | 60.75 |
VMA11 | Completed to specification | 2.04 | 4 | 8.12 |
VMA6 | Produce effective plans to achieve the project objectives | 2.01 | 3 | 6.03 |
Planning | VMA3 | Create strategic planning | 1.98 | 2 | 7 | 3.96 | 46.98 |
VMA1 | Provide effective project management and delivery | 2.13 | 3 | 6.39 |
VMA5 | Provide cost control to achieve the project objectives | 1.99 | 2 | 3.97 |
|