To what extent are the following indicators considered and implemented in this design? | Scale | Total points | Scores gained | Cluster Wms (%) | Group Wms (%) |
0 not implemented 3 considered 5 highly implemented | Weight |
|
Financial performance 19.07% | OPEX | VFI11 | Maximise residual value | 1.829 | 3 | 12 | 5.487 | 48.63 | 36.53 |
VFI6 | Increase economic lifetime | 1.963 | 3 | 5.888 |
VFI15 | Optimise risk-return ratio of alternative options | 1.819 | 0 | 0.000 |
VFI2 | Efficiency of operational expenditure (OPEX) | 1.987 | 3 | 5.960 |
VFI5 | Improve economic efficiency | 2.001 | 3 | 6.003 |
CAPEX | VFI3 | Maximise the cost efficiency to build | 1.891 | 0 | 6 | 0.000 | 24.27 |
VFI1 | Efficiency of capital expenditure (CAPEX) | 1.991 | 3 | 5.974 |
VFI12 | Minimise cost of capital | 1.872 | 0 | 0.000 |
VFI4 | Deliver/achieve cost certainty | 1.877 | 0 | 0.000 |
VFI9 | Return on investment | 1.839 | 3 | 5.516 |
Functional performance 35.49% | Longevity | VFU26 | Provide functional ability of the foundations requirements (strength and stability) | 1.915 | 5 | 29 | 9.575 | 82.71 | 80.03 |
VFU27 | Ensure substructure functional requirements meet a satisfactory level of performance | 1.91 | 5 | 9.551 |
VFU28 | Ensure superstructure functional requirements meet a satisfactory level of performance | 1.92 | 3 | 5.759 |
VFU2 | Increase life of services | 2.039 | 3 | 6.117 |
VFU3 | Provide function-fitness for purpose | 2.044 | 5 | 10.220 |
VFU23 | Configure design to enable an efficient construction process | 2.006 | 3 | 6.017 |
VFU24 | Ensure construction efficiency is considered in specification | 1.968 | 5 | 9.838 |
Reliability | VFU19 | Maintain security-health and safety | 1.929 | 3 | 43 | 5.788 | 78.32 |
VFU21 | Meet all statutory requirements and building regulations | 1.972 | 5 | 9.862 |
VFU22 | Ensure designed elements are standardised | 2.053 | 5 | 10.267 |
VFU20 | Suitability and maintainability of materials | 2.034 | 3 | 6.103 |
VFU15 | Provide durable building-last longer | 1.929 | 5 | 9.647 |
VFU14 | Assure convenience | 1.987 | 3 | 5.960 |
VFU18 | Create reliable building-safer | 1.972 | 5 | 9.862 |
VFU1 | Maintain adaptable building-useful to all | 2.006 | 5 | 10.029 |
VFU8 | Increase efficiency-add capacity | 1.91 | 3 | 5.731 |
VFU13 | Provide disability access | 1.968 | 3 | 5.903 |
VFU16 | Maintain durability | 1.925 | 3 | 5.774 |
Operational performance 17.66% | Manageability | VOP8 | Easy to operate | 1.92 | 3 | 15 | 5.759 | 60.00 | 69.53 |
VOP6 | Easy to maintain | 1.905 | 3 | 5.716 |
VOP9 | Easy to inspect and maintain | 1.896 | 3 | 5.688 |
VOP11 | Provide building systems that are easy to operate and control | 1.905 | 3 | 5.716 |
VOP15 | Reduce operational risk | 1.92 | 3 | 5.759 |
Energy and efficiency | VOP1 | Reduce/minimise/save energy usage | 2.087 | 5 | 16 | 10.435 | 80.74 |
VOP2 | Maintain efficiency in terms of energy | 2.12 | 5 | 10.602 |
VOP3 | Increase efficiency of utilities | 1.944 | 3 | 5.831 |
VOP4 | Increase efficiency of heating, cooling, and lighting | 1.963 | 3 | 5.888 |
Environmental performance 15.66% | Ecoresources | VEN5 | Increase use of natural ventilation | 1.982 | 0 | 3 | 0.000 | 12.07 | 29.71 |
VEN3 | Provide indoor environmental quality | 1.982 | 0 | 0.000 |
VEN4 | Access to natural light, management of air quality, and temperature | 2.034 | 0 | 0.000 |
VEN7 | Specifying low-maintenance, durable, environmentally preferable materials, and equipment | 1.991 | 3 | 5.974 |
VEN10 | Minimise consumption of resources | 1.91 | 0 | 0.000 |
Adaptability | VEN8 | Maximise resource reuse | 1.891 | 3 | 9 | 5.673 | 60.00 |
VEN12 | Respond to site microclimate | 1.882 | 3 | 5.645 |
VEN11 | Conserve water resources | 1.991 | 3 | 5.974 |
Management performance 12.12% | Control | VMA10 | Able to construct to scope/cost/budget/schedule/quality | 1.972 | 0 | 3 | 0.000 | 20.32 | 10.09 |
VMA11 | Completed to specification | 2.039 | 3 | 6.117 |
VMA6 | Produce effective plans to achieve the project objectives | 2.011 | 0 | 0.000 |
Planning | VMA3 | Create strategic planning | 1.982 | 0 | 0 | 0.000 | 0.00 |
VMA1 | Provide effective project management and delivery | 2.13 | 0 | 0.000 |
VMA5 | Provide cost control to achieve the project objectives | 1.987 | 0 | 0.000 |
|