A Dynamic and Heuristic Phase Balancing Method for LV Feeders

Table 4

Different phase balancing results for 15-node feeder.

ā€‰ā€‰ (A) (A) (A) (A)Total feeder loss (kW)

Condition 1SPB 321.36208.79352.09143.3014.44
NN [15]422.74331.16128.34294.418.05
HE [15]350.32237249.92113.3214.07
HM351.73261269.5190.7312.33

Condition 2SPB189.22308.59136.82171.775.98
NN [15]180.75159.87294.01134.146.43
HE [15]212.02211.98210.631.395.26
HM221.25219.25194.327.124.83

Condition 3SPB311.50292.58189.84121.6612
NN [15]379.21264.88149.83229.3817.55
HE [15]264.94265.23263.751.4812.99
HM244.58280.17267.6634.0811.16