Research Article
DOC and CO2-C Releases from Pristine and Drained Peat Soils in Response to Water Table Fluctuations: A Mesocosm Experiment
Table 1
Timetable of the experiment. Numbers in the sampling codes refer to calendar weeks.
| |
Date (2009) |
Calendar week | Water samplings (W) | Gas samplings (G) | Date (2009) | Calendar week | Sampling code | Date (2009) | Calendar week | Sampling code |
| Building peat profiles | Jun. 2-Jun. 3 | 23 | | | | | | |
| Adjusting the water table to control levels | Jun. 3–Jun. 10 | | | | | | | |
| Low water table period (L) | Jun. 11–Sep. 20 | | Sep. 11 | 37 | WL(37) | Aug. 8 | 32 | GL(32) | | | | | Aug. 18 | 34 | GL(34) | | | | | Sep. 1 | 36 | GL(36) | | | | | Sep. 8th | 37 | GL(37) |
| Starting the water additions | Sep. 21 | 39 | | | | | | |
| High water table period (H) | Sep. 21–Oct. 30 | | Oct. 2 | 40 | WH(40) | Sep. 29 | 40 | GH(40) | | Oct. 16 | 42 | WH(42) | Oct. 13 | 42 | GH(42) | | Oct. 23 | 43 | WH(43) | Oct. 19 | 43 | GH(43) | | Oct. 30 | 44 | WH(44) | | | |
|
|