The measures operation is an important component of borehole operation, and the operation effects directly affect the increase of oil and gas production. In perspective of the present reality of borehole operation company, the authors analyze the commonly used type of measures on the oil field, summarize six indicators to evaluate the measures operation effect, and give the quantitative calculation method for six evaluation indicators. Through the experts grading method, we can obtain all the weights of indicators and then establish the fuzzy comprehensive evaluation model of operation effect of measures. The evaluation model can be used to evaluate the operation effect of single well, oil block, or the branch company. Based on the actual data of measures operation of a branch company, using the fuzzy comprehensive evaluation approach to evaluate each block in the branch company, this paper obtained the same conclusion as the qualitative analysis.

1. Introduction

Petroleum and natural gas are two kinds of important resources in people’s material lives and the development process of human civilization. The oil and gas resources in the underground are exploited by way of drilling. But, in the long-term production process, oil-water wells suffer damage from the flow of oil and gas without a break and also from the workover operation in order to maintain normal production and the alteration measures of oil layer in order to enhance oil recovery, which make oil wells change every moment and gradually age, and various types of faults occur, eventually resulting in the fact that the production of oil wells cannot be normal, or is even stop production. Therefore, we must take the borehole operation for the oil-water wells with problems and faults to make the oil wells resume normal production. This means that the borehole operation is an important technology in ensuring the normal production of oil-water wells in the process of oil field development. Moreover, the measures operation is a deciding factor in increasing the production of oil and gas. Currently, the verbal description is the main method to evaluate operation effects in the borehole operation; this only stays on the level of qualitative analysis, and different borehole operation companies for the emphasis on the operation effects are not the same. The most concern for the oil-field companies is the output of oil and gas, and the factors affecting the output of oil and gas are largely determined by the measures of increasing production and injection. Accordingly, this paper analyzes these measures commonly used in oil fields and sums up the evaluation indicators for evaluating the measure effects. According to the daily data record about the measure operation in a borehole operation company, the fuzzy comprehensive evaluation method can be used to evaluate the operation effects of measures. Assume that is the set of indicators and is the ranking set, the fuzzy compressive evaluation model is defined as , where “” is an operator notation. Generally, “” takes , , or . is the weight vector of indicators, and is the evaluation matrix, where is the degree of possibility of the th indicator belonging to the th ranking.

2. Evaluation Indicators and Their Calculation Method

In the process of oil-field development, we often meet with some low-permeability reservoirs; even under a larger differential pressure, it is also difficult to obtain high output. And some reservoirs in the drilling process are invaded by drilling fluid, so it will lower the reservoir permeability near the bottom of well, and then lead to decline the oil output. In addition, oil-water wells in the process of production, due to various reasons, will also be blocked near the bottom, making the injected volume for water injection wells and the oil output for oil wells, thus affecting the mining speed and the recovery rate. In these cases, we must implement all kinds of measures to improve these problem reservoirs or wells on oil-field.

On the oil field, the commonly used stimulation measures mainly include hydraulic fracturing, acidizing, sand prevention, water plugging, secondary solidification, sealing channeling [14]. Hydraulic fracturing is an important technical measure in increasing the production of oil wells and the injected volume of water wells. It has become a widely used international method. It squeezes a kind of liquid with certain viscosity into the reservoirs through the high pressure, resulting in the reservoirs crack, so as to improve the permeability of reservoirs. And acidizing is a kind of widely used measures in improving the oil reservoir and enhancing the permeability, which utilizes the characteristics that the acid liquor can dissolve salt contained in rock formation to improve the reservoir permeability near wellbore area, so as to achieve the purpose of increasing the oil output and the water injected volume. Sanding is one of the common problems for sandstone reservoir in the recovery process, with great harm, would result in the reservoirs buried by sand or the wellholes plugged by sand, causing oil wells to stop production. The quality of these operating measures is directly related to the benefit of the oil field, therefore it is very urgent to conduct the effect evaluation for these operating measures.

From the point of view of evaluation, we can evaluate from single well a block or the whole oil company and also from single measures or multiple measures. If we evaluate the single measures of an oil well, the workload is very large, because thousands of wells need to be repaired every year for a borehole operation company, and a well may need to use more than one kind of measures simultaneously. Therefore, this paper conducts the effect evaluation in units of blocks. Assume there are blocks, denoted as . Through the analysis, we can evaluate the operating effect of measures from the following several aspects.

(1) Incremental Output of Oil ()
The incremental output of oil is divided into the net incremental oil output () and the controlled decreasing oil output (). The net incremental oil output is defined as , where is the cumulative oil production after measures operation, is the average product before measures operation, and is the period of validity of an oil-water well. The controlled decreasing oil output is defined as , where is the cumulative oil production calculated by the natural decreasing law based on the output before measures operation. Unit: “ton”. As any two blocks are different, this paper compares the relative incremental oil output.

(2) Period of Validity ()
The period of validity is defined as , where is the date that the average product after measure operation reaches the ninety percent of the average product before measure operation and is the date when the daily production is under the natural decline oil production after measure operation. Unit: “day”. Here, compare the average period of validity for each block.

(3) Effective Rate ()
The effective rate of measures is defined as , where is the number of effective measures and is the total of measures. When the average output after the measures can be restored to the previous average output of 90%, we call the measures effective.

(4) Construction Period ()
The construction period is defined as , where is the starting date of measures and is the data of well completion. Here, compare the average construction period. Unit: “day”.

(5) Incremental Volume of Water Injection ()
The incremental volume of water injection is defined as , where is the cumulative volume of water injection after acidification and is the average volume of water injection before acidification. Unit: “ton”. Because any two blocks are different, this paper compares the relative incremental volume of water injection.

(6) Water Injection Pressure ()
Considering the actual situation of different blocks, this paper adopts the percentage of reduced value of water injection pressure to compare each block. The reduced value of water injection pressure is defined as , where is the pressure before acidification and is the pressure after acidification, so .

3. Weights of Evaluation Indicators

The importance of different indicators is different in the scheme evaluation, and the measures we describe the size of the importance for an indicator are called the weight of the indicator. The indicator weight is one kind of comprehensive measure including both subjective evaluation and objective expression, reflecting the relative importance between indicators. At present, there have been dozens of methods to determine the weights of indicators [58]. This paper proposes a kind of new method to determine the weights of indicators in the following.

(A) Experts Draw Their Fuzzy Complementary Matrix by Pairwise Comparison Method.
Assume that the th expert compares the above six indicators to get the fuzzy complementary matrix denoted as (). Here, we take the quantity scale of 0.1~0.9 (see Table 1).

(B) Summarize the Experts Grading Values.
Assume that the grading value of the th expert aiming at the indicator of is denoted by , then the grading values of experts are shown in Table 2.

(C) Calculate the Weights of Indicators.
The weights can be obtained by means of the following expression:

where is the weight of th indicator, is the scoring value of th expert to theth indicator, and is the number of experts.

4. Fuzzy Comprehensive Evaluation on the Measure Operation Effect

The fuzzy comprehensive evaluation method is a kind of evaluation method with combining fuzzy theory and mathematical model. According to the given evaluation criteria and the measured values, by means of the fuzzy transformation, we can make evaluation of things. The specific evaluation steps are as follows.(a)Determine the indicator set of operation evaluation of measures . Here, : incremental output of oil and gas; : period of validity; : Effective rate; : construction period; : incremental volume of water injection; : water injection pressure.(b)Determine the ranking set of operation effect . Here, take ,,,,.(c)Determine the weights of all the evaluation indicators . We can get the weights by (1).(d)Write out the evaluation matrix , , where is the degree of possibility of the th indicator belonging to the th ranking.(e)Establish the fuzzy evaluation model: , where “” is an operator notation, here taking .(f)Calculate the evaluation values of indicators and normalizing. According to the maximum subordinate principle, we can obtain the fuzzy comprehensive evaluation results.

The above evaluation matrix is determined based on a specific block, for different blocks; its value is different. In order to have a clear sequencing for the measure effects of all the blocks on an oil-field, it can conduct the following processing.

Assume that there are blocks needing to be evaluated, with 6 indicators of evaluation, so the attribute matrix of all the indicators can be defined as . Since the attributes are generally incommensurate, the attribute matrix needs to be normalized so as to transform the various attribute values into comparable values. For the convenience of calculation and extension, the following two functions are used to calculate the degree of membership.

When the jth indicator is the benefit type, the function is defined by

When the th indicator is the cost type, the function is defined by

In the above-mentioned six indicators, the incremental output of oil and gas, the period of validity, the effective rate, and the incremental volume of water injection are the benefit type, while the construction period and the water injection pressure are the cost type. By (2) and (3), the data matrix can be transformed into a decision matrix, denoted as , and (, ).

According to the grading values given by experts, through (1), we can get the weight vector of all the six indicators . By , we finally obtain the comprehensive effects for all the blocks .

5. Application

The operation data of measures of a borehole operation company in 2010 is as follows.

Crude oil production is 4.78 million tons, 275600 tons of which is the incremental production of measures. All measures are 696 times, and the effective measures are 561 times. The period of validity of measures is 289 days, and the average construction period for measures is 7 days. In 2010, the total volume of water injection is 39.41 million cubic meters, compared with 2009, more than 2.56 million cubic meters. The average injection pressure of 2010 is 24 MPa, and in 2009 the average water pressure is 31 MPa.

Through the experts grade, the weight vector of indicators is decided by From the above data, we can obtain the following.(i)Relative incremental oil production of measures: %.(ii)Period of validity: .(iii)Effective rate: %.(iv)Average construction period: .(v)Relative incremental volume of water injection: %.(vi)Relative drop pressure of water injection: %.

Through the random survey for these on-site oil workers, we acquire the following evaluation matrix: The comprehensive evaluation value can be obtained: Therefore, the operation effect of this company in 2010 is “general.”

6. Conclusions

In this paper, we establish the fuzzy comprehensive evaluation model to evaluate the effect of measures operation for the oil-water well. It is favorable to solve the evaluation problem about the operation effect of measures and also provide a reference for the downhole operation company in decision making. First of all, we analyze the effect factors of measures operation in the process of oil-field development and put forward six indicators to evaluate the operation effect of measures. Secondly, we present a kind of new method to determine the weights of evaluation indicators. Then, summarize the steps to evaluate the operation effect of measures. Finally, based on the actual data of measures operation of a branch company, using the fuzzy comprehensive evaluation method to evaluate the operation effect of measures, this paper obtains the same conclusion as the qualitative analysis.

Acknowledgments

Thanks are due to the support by National Natural Science Foundation of China (no. 50874094).