Research Article

Application of Fuzzy Optimization to the Orienteering Problem

Table 4

The expected value of the total time taken to traverse the path and the total collected score for each of the paths.

PathEV (total time taken)EV (total collected score)

75
2515
1712
2027
1422
3422
1537
4637
2334
3434
2044
2944
4944
5144
3544
2444