Review Article

Future Long-Baseline Neutrino Facilities and Detectors

Table 4

MR power improvement scenario.

Till June 2012 Next step Target

Power (MW) 0.19 0.30 0.75
Energy (GeV) 30 30 30
Rep. cycle (sec.) 2.56 2.40 1.28
No. of bunches 8 8 8
Particles/bunch 1.26 1013 1.9 10132.5 × 
Particles/ring 1.0 1014 1.5 10142.0 × 
Linac (MeV) 181 400 400
RCSa

Harmonic member of RCS.