Economic Analysis for Rebuilding of an Aged Pulverized Coal-Fired Boiler with a New Boiler in an Aged Thermal Power Plant

Mechanical Engineering Department, Yildiz Technical University, 34349 Istanbul, Turkey

Received 25 March 2013; Revised 27 May 2013; Accepted 24 June 2013

Academic Editor: Ahmet Selim Dalkılıç

Copyright © 2013 Burhanettin Cetin and Merve Abacioglu. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Abstract

Fossil-fired thermal power plants (TPP) produce a significant part of electricity in the world. Because of the aging TPPs and so their equipment (especially boiler), thermal power plants also produce less power than their installed capacities, and there has been power loss in time. This situation affects the supply and demand balance of countries. For this reason, aging equipments such as pulverized coal-fired boiler (PCB) must be renewed and power loss must be recovered, instead of building new TPPs. In this study, economic analysis of rebuilding an aged pulverized coal-fired boiler with a new pulverized coal-fired boiler including flue gas desulfurization (FGD) unit and a circulating fluidized bed boiler (FBB) are investigated in an existing old TPP. Emission costs are also added to model, and the developed model is applied to a 200 MWe pulverized coal-fired thermal power plant in Turkey. As a result, the payback period and the net present value are calculated for different technical and economic parameters such as power loss, load factor, electricity price, discount rate, and escalation rate by using the annual value method. The outcomes of this study show that rebuilding of a pulverized coal-fired boiler with a new one is amortized itself in a very short time.

1. Introduction

Population increment, industrializing, and technologic development result directly in increasing energy consumption. This rapid growing trend brings approximately the very important environmental problems such as air pollution and greenhouse effect. Nowadays, about 80% of electricity in the world is produced from fossil fuel-fired thermal power plants [13].

Coal is the most abundant fossil energy resource in the world and exists in almost every major region of the world, but its quality varies greatly from region to region. Coal-fired thermal power plants (TPPs) are the most widely used plants worldwide. Actual electricity production of coal-fired TPPs is 41% of annual world electricity generation, and by 2030 this percentage is expected to rise to 44%. However, many countries use aged pulverized coal-fired boilers (PCBs) (25–40 years) for electricity generation. Moreover, coal (especially poor quality) used in these TPPs for electricity generation causes crucial environmental problems, such as global warming and acid rain, because the poor quality coal cannot be burned cleanly and efficiently in these boilers and their performance deteriorates. Hence, the thermal efficiency of TPPs is to be lower [1, 413].

Although the share of TPPs generating electricity is about 64% within the total installed power in Turkey; its ratio at the compensation of electricity demand is about 75% in 2012. Nowadays, more than 50% of the amount of electricity generated from TPPs is dependent on imported fuel sources, especially natural gas. It is obvious that the main solution of problems like these is efficient utilization of the domestic fuel sources. Therefore, enhancing the performance of the aged coal-fired TPPs is a necessity in terms of energy policy, national security, fuel reserve, and environmental concerns [1, 2, 1416].

In the present work, firstly, economic analysis of rebuilding an aged pulverized coal-fired boiler (PCB) with a new pulverized coal-fired boiler including flue gas desulfurization system (FGD) and a circulating fluidized bed boiler (FBB) are examined in an existing old thermal power plant. Secondly, emission costs are added to model, and the developed model is applied to a 200 MWe pulverized coal-fired thermal power plant in Turkey. Thirdly, the payback period and the net present value are calculated for different technical and economic parameters such as power loss, load factor, electricity price, discount rate, and escalation rate by using the annual value method. As a result, the outcomes of this study show that rebuilding of aged pulverized coal-fired boiler is a necessity for aging thermal power plants.

2. The Importance of Rebuilding

Because of the aging thermal power plants (TPPs) and so their equipment, thermal power plants also produce less power than their installed capacities, and there has been power loss in time. For example, boiler is one of the most important equipment in TPPs. Due to the aging of boilers, the problems such as slag and degradation of heat transfer increase and boilers produce less steam than their design values. As a result, TPPs also produce less power than their design values. Developing countries need more power and must build new plants to meet increasing demand. So, countries must recover power loss in aging TPPs, instead of making new investments. Moreover, chronic power shortages and scarcity of capital funds have led many countries to apply them to rebuilding of aging thermal power plants, instead of building new ones, because new power projects go through long environmental assessments and approval processes. Development of infrastructure for these projects, following the approval, also takes considerable time and entails high capital costs, whereas rebuilding of aging TPPs can be done in a relatively short time at a much lower cost. Therefore, TPPs can add more power to grid and benefit from recovering capacity through upgrades of old equipment such as aging boiler. In this connection, upgrading of aged pulverized coal-fired boilers (PCBs) can be one of the urgent needs for many countries because of the economic and environmental pressures [1, 6, 9, 14, 15].

In addition, aged PCBs must deal with both the decreasing quality of fuel and strict environmental standards. Moreover, the performance of these boilers is very bad, and emissions are very high. It is a vital issue to meet the increasing electricity demand and decrease emissions for many countries. Therefore, the rebuilding of aged PCBs with new one can be very important for adding more power to the grid and decreasing emissions.

3. Methodology

In this study, all costs and benefits during the economic lifespan of the system are expressed annually. Then, the payback period and the net present value are calculated for rebuilding of aged pulverized coal boiler (PCB) with a new PCB including flue gas desulfurization (FGD) unit and circulating fluidized bed boiler (FBB).

The rebuilding of aged PCB with a new PCB including flue gas desulfurization unit or a circulating FBB requires some changes, such as need for more area for FGD unit or replacement of super heaters. In addition, operation and maintenance costs will be different by rebuilding. Also, the thermal power plant is not operated throughout the rebuilding. Therefore, electricity is not sold during the rebuilding. Moreover, the results will change by adding FGD unit, because emissions will decrease. So, emission taxes will decrease. All these factors have been considered in the study. Because the proportion of auxiliary power consumption within total expenditure is very low, it is not taken into consideration in the analysis. Moreover, a similar methodology has been used, and assumptions have been taken as the same for two different technologies except for specific costs. Accordingly, total expenditure () and gain () can be calculated from (1) and (2), respectively [1723].

Consider the following: where is the total cost, ($/kWe) is the specific investment cost for new PCB with FGD, FBB, and auxiliary equipment, ($/kWe) is the specific cost of dismantling, erection, and commissioning, ($/kWe) is the specific constant operation and maintenance cost such as employees’ salary, is the revenue lost for the downtime period, is the annual total gain, is the annual additional electricity gain obtained from incremental power production, is the annual additional gain because of fuel savings, is the annual gain due to the decrease in emissions after rebuilding, DP (h) is the downtime period, ($/kWeh) is the unit electricity price, ($/kg) is the unit fuel price, LHV (kcal/kg) is the low heat value of fuel, (h) is the annual average operation duration of the plant, is the thermal efficiency of TPP before rebuilding, th is the thermal efficiency of TPP after rebuilding, (kWe) is the installed power of the plant, (kWe) is the operating power before revamping, and LF (%) is the annual average load factor of plant.

Unit emission cost is taken as $0,22/kgCO2, $11/kgSO2, and $5,7/kgNOx for CO2, SO2, and NOx, respectively [17, 19, 20, 22, 23]. Then, annual emission costs are found and added to total gain.

Total expenditure () can be converted to annual constant expenditure () by using amortization factor (AF). Then, payback period (PBP) can be calculated (9). The payback period is the time of equality of the cost and benefit. Therefore, it is calculated with the rate of total annual constant expenditure () to total annual gain (). Net present value (NPV) which includes escalation rates for electricity price and fuel price and discount rate can be determined from (10).

Consider the following: where (year) is the economic life span, is the period, and (%) is the discount rate.

4. Case Study and Discussion

The prior aim of this study is to present a general economic model to evaluate quickly the rebuilding of aged pulverized coal-fired boiler (PCB) with a new one in existing thermal power plants (TPPs). Hence, it can be an important study for the evaluation of aging TPPs for researchers and operators of TPPs. Specific costs such as , , and and technical data for case study have been taken from the literature ([1, 6, 15, 21]), authorities of Turkish Electricity Generation Co., Inc. (EUAS; http://www.euas.gov.tr/), and operators of Soma Thermal Power Plant (an institution of EUAS) in Manisa in Turkey. EUAS produces about half of Turkish electricity production, and it is a very important official institution of Turkey. Therefore, they are approximate values for case study. Conclusions of case study depend on these values. Moreover, auxiliary power consumption and boiler efficiency for two firing system are important parameters. Because the proportion of auxiliary power consumption within total expenditures is low and boiler efficiency for two firing system is very close to each other [6, 12], they are not taken into consideration in the analysis, but more accurate and sensitive solutions can be obtained from the development model by considering real cost values, auxiliary power consumption, and combustion efficiency.

Coal (especially lignite) is an important fuel source for Turkey and it is used mostly for electricity generation. On the basis of the latest estimates, the total lignite reserves of Turkey have reached approximately 11.5 billion ton. However, poor quality lignite (below 2000 kcal/kg) accounts for about 70% of these reserves. Share of better quality lignite (over 3000 kcal/kg) is very low (6%). The other lignite reserve (between 2001 and 3000 kcal/kg) accounts for about 24% [7, 16]. The developed model is applied to a 200 MWe pulverized coal-fired TPP in Turkey. Then, the payback period (PBP) and net present value (NPV) are computed. Coal quality effects PBP and NPV. Coal quality is directly related to lower heating value. The coal used in a 200 MWe thermal power plant example is poor quality coal (lower heating value is 1800 kcal/kg). Therefore, PBP decreases and NPV rises if the coal quality increases. Table 1 taken from the literature shows the technical and economic values for the case study [1, 6, 15, 16].

tab1
Table 1: Technical and economic parameters for the case study.

PBP and net present value NPV can change from country to country. Therefore, the effects of almost all technical and economic parameters, such as power loss, downtime period, escalation rate, and discount rate on PBP and NPV are investigated. As a result, it is seen that power loss has a significant effect on the NPV and PBP. When the power loss increases in the aged pulverized coal-fired TPP, the PBP decreases, and the NPV rises. So, the rebuilding is indispensable if power loss is high in aged pulverized coal-fired TPPs, especially after 30 MWe. NPV and PBP values are closer to each other for FBB and new PCB with FGD system when emission costs are not included (Figures 1 and 2), because TPPs can add more power to grid and benefit from recovering capacity through upgrades of aging equipment. The other parameters are also investigated in this study. However, their effects are less than power loss effects, so there is no place in this paper.

270159.fig.001
Figure 1: The variation of payback period (PBP) with power loss at PCB with FGD and FBB without emission costs.
270159.fig.002
Figure 2: The variation of net present value (NPV) with power loss at PCB with FGD and FBB without emission costs.

When the emission costs are added to FBB system, rebuilding is more advantageous (Figures 3 and 4). The results show the necessity of rebuilding with FBB in many countries when the taxes for emissions are engaged in the future. Besides, the results with emission taxes present the necessity of adding an eliminating system, because the PBP is decreasing and the NPV is increasing too much when the emission costs are eliminated. The difference between results includes and excludes emission taxes which are clearly seen from Figures 3 and 4.

270159.fig.003
Figure 3: The variation of payback period (PBP) with power loss at FBB.
270159.fig.004
Figure 4: The variation of net present value (NPV) with power loss at FBB.

Figures 5 and 6 show the variation of the payback period with downtime period and load factor at new PCB with FGD without emission costs, respectively. When the downtime period is decreased and the load factor is increased, payback period is diminished, because after rebuilding, income increases.

270159.fig.005
Figure 5: The variation of payback period with downtime period at new PCB with FGD without emission costs.
270159.fig.006
Figure 6: The variation of payback period with load factor at new PCB with FGD without emission costs.

5. Conclusions and Suggestions

This study firstly presents a general economic model for the rebuilding of a pulverized coal boiler (PCB) with a new PCB including flue gas desulfurization (FGD) unit and circulating fluidized bed boiler (FBB). Secondly, a case study is performed for a 200 MWe aging pulverized coal-fired thermal power plant (TPP). Finally, the emission taxes are added to the model, and analysis is repeated.

Payback period (PBP) and net present value (NPV) are closer to each other for FBB and new PCB including FGD when emission costs are not included. Of the investigated parameters, power loss has the greatest effect on PBP and NPV. Therefore, if power loss is very high in the existing TPP, the rebuilding will be very convenient. The more the increase of power loss at the old thermal power plant is, the more advantageous the rebuilding gets, especially after 30 MWe. The results show that the rebuilding of PCB with a new PCB with FGD unit system or FBB system is a cost-effective method, since it is amortized in a very short time.

Moreover, the results show the necessity of rebuilding when the taxes for emissions are engaged in a lot of countries in the future. When the emission costs are added to the model, rebuilding is more advantageous. When the emission taxes are added to the costs, the results are changing very much, the PBP is decreasing and the NPV is increasing too.

The prior aim of this study is to present a general economic model to evaluate quickly rebuilding of aged PCB with a new one in TPPs and to show that rebuilding of a PCB with a new one is a necessity. Technical and economic data in the case study are approximate values. Conclusions of the case study depend on these values. Therefore, more accurate and sensitive solutions can be obtained from the development model by considering real cost values, auxiliary power consumption, and combustion efficiency.

References

  1. B. Cetin, “Economic model for the revamping of a pulverized coal-fired boiler,” Energy Sources B. In press.
  2. H. H. Erdem, A. V. Akkaya, B. Cetin et al., “Comparative energetic and exergetic performance analyses for coal-fired thermal power plants in Turkey,” International Journal of Thermal Sciences, vol. 48, no. 11, pp. 2179–2186, 2009. View at Publisher · View at Google Scholar · View at Scopus
  3. Ü. Çamdali and V. Ş. Ediger, “Optimization of fossil fuel sources: an exergy approach,” Energy Sources A, vol. 29, no. 3, pp. 251–259, 2007. View at Publisher · View at Google Scholar · View at Scopus
  4. H. H. Erdem, A. Dagdas, S. H. Sevilgen et al., “Thermodynamic analysis of an existing coal-fired power plant for district heating/cooling application,” Applied Thermal Engineering, vol. 30, no. 2-3, pp. 181–187, 2010. View at Publisher · View at Google Scholar · View at Scopus
  5. B. G. Miller and S. F. Miller, “Fluidized-bed firing systems,” in Combustion Engineering Issues For Solid Fuel Systems, B. G. Miller and D. A. Tillman, Eds., chapter 8, Elsevier, 2008.
  6. S. Kavidass, D. J. Walker, and G. S. Norton, “IR-CFB Repowering: a cost-effective option for older pc-fired boilers,” in POWER-GEN International '99, New Orleans, Lo, USA, December 1999.
  7. A. Hepbasli, “Coal as an energy source in Turkey,” Energy Sources, vol. 26, no. 1, pp. 55–63, 2004. View at Scopus
  8. N. Eskin and A. Hepbasli, “Development and applications of clean coal fluidized bed technology,” Energy Sources A, vol. 28, no. 12, pp. 1085–1097, 2006. View at Scopus
  9. P. Basu and P. K. Halder, “New concept for operation of a pulverized coal-fired boiler using circulating fluidized bed firing,” Journal of Engineering for Gas Turbines and Power, vol. 111, no. 4, pp. 626–630, 1989. View at Scopus
  10. P. Basu, “Combustion of coal in circulating fluidized-bed boilers: a review,” Chemical Engineering Science, vol. 54, no. 22, pp. 5547–5557, 1999. View at Scopus
  11. G. A. Ryabov, O. M. Folomeev, D. S. Litun, D. A. Sankin, and I. G. Dmitryukova, “Prospects for using the technology of circulating fluidized bed for technically refitting Russian thermal power stations,” Thermal Engineering, vol. 56, no. 1, pp. 31–40, 2009. View at Publisher · View at Google Scholar · View at Scopus
  12. S. Kavidass, G. L. Anderson, and G. S. Norton, “Why build a circulating fluidized bed boiler to generate steam and electric power,” in POWER-GEN Asia '00, Bangkok, Thailand, September 2000.
  13. J. Koornneef, M. Junginger, and A. Faaij, “Development of fluidized bed combustion-An overview of trends, performance and cost,” Progress in Energy and Combustion Science, vol. 33, no. 1, pp. 19–55, 2007. View at Publisher · View at Google Scholar · View at Scopus
  14. P. Basu, “Operation of an existing Pulverized-Coal fired boiler as a circulating fluidized bed boiler—a conceptual study,” Journal of the Institute of Energy, vol. 60, no. 443, pp. 77–83, 1987. View at Scopus
  15. M. Abacioglu, Investigation of a pulverized coal boiler with circulating fluidized bed boiler in an existing thermal power plant [M.S. thesis], Yildiz Technical University Graduate School of Natural and Applied Science, Istanbul, Turkey, 2012.
  16. http://www.euas.gov.tr/Sayfalar/YillikRaporlar.aspx.
  17. Å. Karlsson and L. Gustavsson, “External costs and taxes in heat supply systems,” Energy Policy, vol. 31, no. 14, pp. 1541–1560, 2003. View at Publisher · View at Google Scholar · View at Scopus
  18. T. Berntsson, Heat Sources-Technology, Economy and Environment, Department of Heat & Power Technology. Chalmers University of Technology, Göteborg, Sweden, 1999.
  19. J. Sjödin, “Modelling the impact of energy taxation,” International Journal of Energy Research, vol. 26, no. 6, pp. 475–494, 2002. View at Publisher · View at Google Scholar · View at Scopus
  20. T. Hamacher, R. M. Sáez, K. Aquilonius et al., “A comprehensive evaluation of the environmental external costs of a fusion power plant,” Fusion Engineering and Design, vol. 56-57, pp. 95–103, 2001. View at Publisher · View at Google Scholar · View at Scopus
  21. B. Sahin and N. Aybers, Energy Cost, Yildiz Technical University Press, Istanbul, Turkey, 1995.
  22. E. Fahlén and E. O. Ahlgren, “Accounting for external costs in a study of a Swedish district-heating system—an assessment of environmental policies,” Energy Policy, vol. 38, no. 9, pp. 4909–4920, 2010. View at Publisher · View at Google Scholar · View at Scopus
  23. T. Kosugi, K. Tokimatsu, A. Kurosawa, N. Itsubo, H. Yagita, and M. Sakagami, “Internalization of the external costs of global environmental damage in an integrated assessment model,” Energy Policy, vol. 37, no. 7, pp. 2664–2678, 2009. View at Publisher · View at Google Scholar · View at Scopus