The three rates of the forecasts obtained using different ensemble methods in the Xixian catchment during the training period.

Lead time (days)EMBREMLRSVR
HRFARMARHRFARMARHRFARMARHRFARMAR

160.7834.974.2570.5917.9711.4467.9724.517.5291.184.584.25
266.0127.786.2172.2218.958.8268.9522.888.1787.587.844.58
362.4231.705.8869.9321.248.8266.6724.189.1579.4113.407.19
454.5835.959.4866.0123.2010.7860.1328.7611.1190.523.925.56
554.5834.9710.4662.7525.1612.0951.9637.9110.1388.895.235.88
651.9637.5810.4662.4226.1411.4416.6774.848.5084.646.868.50
750.0038.2411.7662.0925.8212.0914.3876.808.8284.647.198.17