Research Article

Improving TIGGE Precipitation Forecasts Using an SVR Ensemble Approach in the Huaihe River Basin

Table 5

The three rates of the forecasts obtained using different ensemble methods in the Xixian catchment during the verification period.

Lead time (days)EMBREMLRSVR
HRFARMARHRFARMARHRFARMARHRFARMAR

167.9722.889.1578.437.1914.3868.6318.9512.4281.7010.467.84
267.9724.187.8474.5116.998.5068.6320.2611.1173.2014.3812.42
352.9437.919.1566.0124.189.8058.8227.4513.7371.9018.309.80
456.8633.339.8066.6721.5711.7659.4826.8013.7377.1211.1111.76
554.2534.6411.1160.7826.1413.0752.9432.0315.0373.8615.6910.46
650.9834.6414.3863.4021.5715.037.8474.5117.6575.8212.4211.76
747.0636.6016.3457.5224.8417.6515.6969.2815.0371.9012.4215.69