Abstract

This numerical weather prediction study investigates the effects of data assimilation and ensemble prediction on the forecast accuracy of moderate and heavy rainfall over New Zealand. In order to ascertain the optimal implementation of state-of-the-art 3Dvar and 4Dvar data assimilation techniques, 12 different experiments have been conducted for the period from 13 September to 18 October 2010 using the New Zealand limited area model. Verification has shown that an ensemble based on these experiments outperforms all of the individual members using a variety of metrics. In addition, the rainfall occurrence probability derived from the ensemble is a good predictor of heavy rainfall. Mountains significantly affect the performance of this ensemble which provides better forecasts of heavy rainfall over the South Island than over the North Island. Analysis suggests that underestimation of orographic lifting due to the relatively low resolution of the model (~12 km) is a factor leading to this variability in heavy rainfall forecast skill. This study indicates that regional ensemble prediction with a suitably fine model resolution (≤5 km) would be a useful tool for forecasting heavy rainfall over New Zealand.

1. Introduction

The initial conditions of a numerical weather prediction (NWP) forecast are usually generated by data assimilation, a procedure statistically combining observations and a model forecast and utilising their respective error information to create an optimum estimate of the true atmospheric state compatible with the forecast model in use. Uncertainty and errors are unavoidable in the initial conditions of an NWP due to meteorological equipment errors, sampling errors, and data assimilation errors, and so forth. Ensemble forecasts have been used for some 20 years at major meteorological prediction centres to explore the impact of these uncertainties in the atmospheric initial conditions (and other boundary conditions) on NWP. Several methodologies have been used to establish the global ensemble systems (GES) including those based on the leading singular vectors of the operator [1, 2], bred vectors [3, 4], the Monte Carlo method [5], and the Monte Carlo based ensemble Kalman filter [6].

The spatial resolution of currently operational GES is low (e.g., ~32 km for the current operational ECMWF ensemble system). Many small scale processes in the atmosphere and the underlying surface and small scale mountains that significantly affect the evolution and development of severe weather are not resolved by GES. Regional ensemble systems (RES) were thus established. The resolution of RES differs. Some have very high resolutions so that supercell storms and convections can be resolved (e.g., [79]). The way to initialize a RES also differs. Some RESs are initialized from a GES. Some RESs randomly sample the climatological uncertainties of the initial state [10]. Others derive random perturbations from the background error statistics of an existing 3D/4Dvar system (e.g., [1113]). Some RESs use different model physics and different global deterministic model outputs to generate members (e.g., [14, 15]). Some use different regional model outputs called multimodel ensemble [16]. For heavy rainfall forecasts, RES has shown higher forecasting skills than GES (e.g., [14, 17, 18]).

New Zealand lies in the midlatitude southwest Pacific, surrounded by ocean. The two main islands are North Island and South Island. North Island (Figure 1(a)) has a “spine” of mountain ranges extending from the middle, with gentle rolling farmland on both sides. The South Island is dominated by mountain ranges running its entire length. The main mountain range with a southwest to northeast orientation is known as the Southern Alps (Figure 1(b)). Under the prevailing midlatitude westerly winds, the western region of New Zealand is generally the windward side and the eastern region is the lee side.

Rainfall amount is much higher over land areas than over the nearby sea because of orographic lifting (Figure 1). Overall, much more rainfall occurs in the western area of the South Island than on other areas of the country, because of orographic lifting of more consistent westerly airflows and more uniform mountains. Heavy rainfall often leads to severe flooding and landslides in New Zealand. Thus, a reliable heavy rainfall prediction is of great importance but still a big challenge, largely due to the open seas surrounding the small island country with sparse ground-based/surface observations and rawinsondes. To overcome the problem of lack of meteorological observations for New Zealand, satellite data have been widely used in a regional 3Dvar system based on the New Zealand limited area model (NZLAM, [19, 20]) for a 48-hour NWP in New Zealand. This has shown improvements [21].

4Dvar has been implemented at some major meteorological centres (e.g., Met Office and ECMWF) to replace 3Dvar. Their verification statistics show an overall higher forecasting skill for 4Dvar (e.g., [22]). Recently an experimental regional 4Dvar for NZLAM has been set up from the UK Met Office VAR codes. To compare the impact on the forecasts of the 3Dvar and 4Dvar data assimilation methods, to tune the 4Dvar for the best possible result, and to test the impact of new observation types (e.g., surface marine observations) on both analysis methods, 12 numerical experiments based on NZLAM were conducted over the period of 35 days from 13 September to 18 October 2010 (Table 1). Each experiment differs in either the analysis system, or system configuration, or the surface and satellite data assimilated.

In this study, a temporary RES was created by combining 12 experiments originally intended to compare the impact of the 3Dvar and 4Dvar techniques on the skill of NZLAM forecasts. Although the principal behind this ensemble is similar to ensemble systems which use different model physics or/and different regional/global deterministic model outputs [1416], members of this ensemble system employed the state-of-the-art 3Dvar and 4Dvar techniques in assimilating satellite data [22]. To our knowledge, this is the first attempt at predicting heavy rainfall in New Zealand using a RES.

The objective of this study is to investigate the effect of data assimilation and ensemble method on moderate and heavy rainfall prediction over New Zealand. Of particular interest is how mountains affect the performance of a RES in prediction of moderate and heavy rainfall and therefore the suitable model resolution for a RES over New Zealand. Following the introduction, the modelling system and methodology are described in Section 2. Two heavy rainfall cases forecasted by this RES are described in Section 3. Statistical analysis regarding the performance of this RES is presented in Section 4. The effect of mountains on this RES is discussed in Section 5. Finally a short conclusion is given in the last section.

2. Description of the Modelling System and Methodology

All the simulations in this study were made by using the NZLAM, a regional configuration of the Met Office’s Unified Model (UM, [23]). The UM has a nonhydrostatic, fully compressible formulation of the Navier-Stokes equations using a terrain following, height-based vertical coordinate. It employs a horizontally staggered Arakawa C-grid and a vertically staggered Charney-Phillips grid; semi-Lagrangian advection for all prognostic variables, except density, with conservative and monotone treatment of tracers; predictor-corrector implementation of a two-time-level, semi-implicit time integration scheme; and three-dimensional iterative solution of a variable-coefficient elliptic equation for the pressure increment at each time step (see [23, 24] for detailed descriptions). The NZLAM has 324 by 324 horizontal grid points with a horizontal grid spacing of 0.11° (about 12 km, [19, 20]) and 70 levels in the vertical, with the model top at about 39 km. The highest vertical resolution is near the ground such that 20 levels span the lowest 2 km of the atmosphere. A global run provided the same lateral boundary conditions for all the ensemble simulations.

All the experiments were classified as two groups with initializations based on 3Dvar (five members) and 4Dvar (seven members), respectively (Table 1). The former uses an incremental 3Dvar FGAT (first guess at appropriate time) analysis scheme [25]. The latter is based on the former with many aspects kept in common and is provided by the introduction of a linear perturbation forecast model and its adjoint [22]. In both schemes, a transform (including a parameter transform, a vertical transform, and a horizontal transform) is implemented to provide an implicit representation of the background error covariance and a practical and easy method of preconditioning the analysis minimisation problem. For the five 3Dvar-based members, the analysis resolution used (0.22 degrees) is half the model resolution, whilst, for the seven 4Dvar-based members, the resolution is the same as the model resolution (Other experiments, not presented here, have shown that using full or half resolution analysis increments for 3Dvar makes very little difference to the verification scores against observations for forecasts out to T+48; however, using lower resolution analysis increments for 4dvar significantly reduces forecast skill.) (Table 1). The vertical transform uses zonal and seasonal average statistics to produce two-dimensional empirical modes. The horizontal transform can also be used as a filter, to remove small scale modes from each horizontal field. Following the ideas of Cullen [26] we used this to exclude scales smaller than 50 km for 4D11a and smaller than 100 km for 4D11b, 4Dcli, 4Dclim, 4DclimB, and 4DclimC. Both 3D and 4Dvar performed a 6 hourly data assimilation cycle throughout the study period. After 0000 UT on 13 September 2010 (the initial time for each experiment), the background used for the analysis for each experiment differed to some extent. 48-hour forecasts were made following the 0000, 0600, 1200, and 1800 UT analyses for each experiment each day and simulated fields were saved hourly.

The ensemble mean was calculated with an equal weight for each member. In addition to root mean square errors (RMSE) and mean errors (ME), categorical forecasts at the two thresholds were examined using the performance diagram [27] and relative operating characteristic (ROC) diagram. The performance diagram plots the hit rate () against the success ratio (, the false alarm ratio) and allows the bias and critical success index (CSI) to be read directly. The ROC diagram plots the hit rate against the false alarm rate () from which it is easier to deduce base rate independent performance metrics such as the Peirce skill score (PSS) or symmetric extreme dependence index (SEDI). The latter measure is useful for rare events as it is nondegenerate [28]. Definitions for these categorical metrics are given in Table 2.

In the following calculation and analysis, all four forecasts on each day for each member during the 35 days were used. For each forecast, the forecast rainfall was chosen to match the observations in time. The rainfall forecast at the four grid points surrounding an observation site was linearly interpolated onto that site using distance as the weighting factor.

3. Two Heavy Rainfall Cases

Daily rainfall analysis with 0.05-degree resolution over New Zealand land surface is available at the National Institute of Water and Atmosphere Research (NIWA) derived using the second order derivative trivariate thin plate smoothing spline spatial interpolation model (http://www.maths.anu.edu.au/research/projects/thin-plate-splines). These data may have some errors and uncertainties in mountainous areas with sparse observations, but they are the best high resolution grid point rainfall data over New Zealand. These data are compared with forecasted rainfall by the ensemble for two heavy rainfall cases.

For Case 1, a subtropical cyclone with a tropical origin moved southeastward and approached the nearby sea to the northeast of the North Island in the early morning of 13 October 2010 (Figure 2(a)). A warm front (denoted by “WARM F”) associated with the cyclone moved southwestward in the northeasterly winds of the cyclone. Ahead of the warm front were southeasterly winds. The warm front reached the southeast coastal region of the North Island on the morning of 13 October. Orographic lifting of the strong southeasterly winds (10–15 m s−1 surface winds at a coastal station) ahead of the warm front enhanced vertical motion in the frontal rainband. This led to very heavy rainfall in a broad area of the southeast North Island (Figure 3(a)). The rainfall analysis showed a rainband with four rainfall maximum centers from northeast to southwest. At some locations, the observed 24-hour rainfall at 0900 NZST on the 14 October was about 190 mm. Figure 3(c) shows the 24-hour rainfall forecast by the ensemble mean using equal weight. Most of the heavy rainfall areas were captured by the ensemble mean. However, the ensemble missed two of the four rainfall maximum centers: the southernmost one and the one in the middle of the rainband. For the two rainfall maximum centers captured by the ensemble, the maximum was 25–50 mm lower than observations. The terrain data in Figure 3(a) with a resolution of roughly 5 km, much higher than the model terrain (Figure 3(c), roughly 12 km resolution), can describe smaller mountains. For example, a small mountain is shown in Figure 3(a) associated with the southernmost rainfall maximum center, but not shown by the model terrain (Figure 3(c)). The mountain corresponding to the rainfall maximum center in the middle of the rainband (Figure 3(a)) is more pronounced and higher than that in the model terrain (Figure 3(c)). For this heavy rainfall case, the convective available potential energy (CAPE) was very small (<100 J kg−1), implying a very weak contribution from convective rainfall and a correspondingly stronger orographic component. It appears that the underestimation of the heavy rainfall by the ensemble is partly due to the relatively low resolution of the model, which underestimates the orographic lifting. This will be further analysed in Sections 4.2 and 5.

The forecast occurrence of daily rainfall greater than 50 mm with probability higher than 0.6 (Figure 4(c)) captured most of the areas with observed daily rainfall greater than 50 mm (Figure 4(a)). Most of the areas in the southeast of the North Island had a daily rainfall greater than 100 mm for this heavy rainfall case (Figure 4(b)). However, less than half of these areas were forecast to get greater than 100 mm with occurrence probability higher than 0.6 (Figure 4(d)) by the ensemble. This is due to the underestimation of rainfall by the model.

For Case 2, on 28 September 2010, an eastward moving midlatitude cyclone was over the sea to the southwest of the South Island (Figure 2(b)). The westerly winds associated with the cyclone advected the cold front (denoted by “COLD F”) eastward. Ahead of the cold front were northwesterly winds. When the cold front reached the South Island, orographic lifting and island blocking of the strong northwesterly and westerly winds around the front enhanced the vertical motion in the associated rainband, leading to heavy rainfall on the windward (western) areas of the South Island on that day (Figure 3(b)). The ensemble mean generally forecast well the heavy rainfall amount and distribution, except that it missed the heavy rainfall at the southern end of the rainband (Figure 3(d)). The ensemble based forecast occurrence of daily rainfall greater than 50 mm with probability higher than 0.6, a large area on the windward side of the South Island (Figure 5(c)), corresponded well to most of the areas with observed daily rainfall greater than 50 mm (Figure 5(a)). Observed daily rainfall greater than 100 mm occurred only over a small area on the windward side (Figure 5(b), the small shading area in the circle). The ensemble based forecast of daily rainfall amount greater than 100 mm with probability equal to 0.6 also showed a small area (Figure 5(d), the shading area in the circle) close to that in Figure 5(b).

These analyses suggest that probability of greater than 0.6 of occurrence of rainfall greater than some threshold from the ensemble is a good predictor for heavy rainfall in New Zealand. Compared with Case 1, the ensemble performed better for Case 2, especially for daily rainfall greater than 100 mm. In fact, using the 0.05-degree grid point rainfall analysis, the RMSE of the ensemble mean for daily rainfall greater than 50 mm was 78 mm and 111 mm for Case 2 and for Case 1, respectively. The reason for the better performance of the heavy rainfall forecast over the South Island by the ensemble will be further analysed in Sections 4.2 and 5.

4. Statistical Analysis

In this section, the ensemble RMSE, ME, and categorical skill scores for two rainfall categories are presented. The first category includes events in which either simulated or observed daily rainfall is equal to or higher than 50 mm (also called heavy rainfall). Because there were only 35 days for each experiment, a second threshold of 20 mm/day (mod-heavy rainfall) was chosen to ensure a sample size sufficient for statistically robust results. Daily rainfall observations (valid at 0900 NZST) at 630 sites over New Zealand during the 35 days were used.

4.1. The Whole Country

The ability of the different ensemble members (and ensemble means) to correctly predict rainfall events for the two different thresholds was investigated by converting the forecasts and observations into binary events. Contingency tables for the ensemble mean (MM) at these two thresholds are shown in Table 3. Figure 6 shows the categorical performance diagram for mod-heavy and heavy rainfall over all of New Zealand. MM has the highest critical success index and the lowest false alarm ratio as compared with each member for both thresholds.

However, from Figure 6, it can be seen that the MM frequency bias for heavy rainfall is worse than for almost all of the individual members. That is, the improvement in FAR has not been matched by an improvement in hit rate, resulting in a greater tendency for MM to underpredict the occurrence of heavy rainfall events. The ability to improve the CSI by hedging, that is, by reducing the frequency of forecasted events as outlined above, is one of the undesirable properties of the CSI. The Peirce skill score (PSS) is a categorical metric which does not have this property and is also base rate independent (insensitive to the sample climatology).

Peirce skill scores are shown in the ROC diagrams in Figures 7(a) and 7(c) which contain the mod-heavy and heavy rainfall results, respectively, for all of New Zealand. In contrast to CSI, PSS does not show the ensemble mean MM as being significantly better than any of the individual members. For the mod-heavy threshold, MM has the highest score, but it is the same as 3DclimC within uncertainties. For heavy rainfall, MM does not have the best PSS, but, within uncertainties, it is not worse than any of the individual members.

While it has many desirable properties, PSS is not always appropriate as it tends to meaningless values for vanishingly rare events (known as degeneracy). Ferro and Stephenson [28] developed the symmetric extremal dependence index (SEDI), in turn based on the extreme dependency score proposed by Stephenson et al. Both of these metrics are nondegenerate, but the SEDI has the advantage as it is base rate independent and difficult to hedge. Figures 7(b) and 7(d) contain the same data as Figures 7(a) and 7(c) except that the shading represents the SEDI instead of the PSS. From these diagrams it can be seen that, in contrast to the CSI and PSS, the magnitude of the SEDI is similar for both mod-heavy and heavy rainfall. In addition, the SEDI implies that for mod-heavy rainfall MM shows a larger improvement over the individual ensemble members and for heavy rainfall it is similar to the best performing members.

Figure 8 shows the RMSE over the whole country for all ensemble members. For mod-heavy rainfall, the RMSE of the ensemble mean (MM) was smaller than that of each member; the largest was ~26.0 mm for 4dvar11, about 1.8 mm higher than MM. The difference in the RMSE between each member and MM was statistically significant at the 95% level using the -test.

For heavy rainfall, the RMSE of the MM (~43 mm) was smaller than that for all members except for 3Dcli (~43.0 mm). The largest RMSE was 46.5 mm for 4dvar11, about 3.5 mm higher than the MM. Except for 3Dcli and 4DclimB, the difference in the RMSE between each member (except for 3Dcli) and MM was statistically significant at 95% level using a -test.

These results indicate that the ensemble mean is better than any of the individual ensemble members for forecasting mod-heavy rainfall over New Zealand. For heavy rainfall, the performance of the ensemble mean is better or similar to the best performing members. The small difference in the performance of the ensemble system between mod-heavy rainfall and heavy rainfall may be due to the smaller observation number for the latter (Table 3).

For the two daily rainfall categories, the mean errors (ME, forecast-observations) showed consistent negative values for each member (Figure 8(b)), especially for heavy rainfall, indicating that parts of the heavy rainfall forecast errors come from the negative bias. In addition to model physics, the relatively low model resolution (~12 km) is most likely another reason for the underestimation of rainfall. This will be further analysed in the following section and Section 5.

A possible reason for this improvement seen in the simple ensemble mean may be that it is simply due to the smoothing effect of calculating the mean of the 12 members. In other words, taking any member of the system and doing spatial smoothing, the improvement achieved might be as much as that from the ensemble mean. To investigate this possibility a 9-point smoother was applied three times to the rainfall forecast for each ensemble member and compared with the unsmoothed (Figure 9) via their RMSE. For mod-heavy rainfall, the 9-point smoother decreased the RMSE (Figure 9(a)) by 0.1–0.5 mm for each member. For MM, the smoother increased the RMSE by ~0.2 mm. The improvement of MM over each member was 0.5–1.6 mm for RMSE, much larger than that of each member achieved by the 9-point smoother. In contrast, for heavy rainfall the smoother significantly increased the RMSE for each member and MM by 0.8–2.0 mm. These facts indicate that the improvement of the simple ensemble mean in mod-heavy rainfall and heavy rainfall was mainly achieved from the simple ensemble system, not by the smoothing effect.

4.2. Different Regions

The results for the North and South Island ensemble mean (MM) compared to the individual members are consistent with those found for the full country. That is the forecast skill of the MM, by various measures, and is similar to or better than any individual member and the frequency bias has been reduced compared to the majority of members (not shown).

The RMSE and ME of the North and South Island results for the subset of events that were forecast correctly or observed are shown in Figure 10 for mod-heavy rainfall and Figure 11 for heavy rainfall. For the North Island at both rainfall thresholds, MM has the lowest RMSE and for the South Island only 3Dcli has a lower RMSE than MM.

Here, a question needs to be answered is in which island (the North Island versus the South Island) the performance of the ensemble is better? The total number of rainfall observation sites and heavy rainfall observations were different between the two islands. It is not appropriate to use the forecasting skill analysis with only two rainfall categories to do the evaluation. Instead, RMSE and ME that can quantitatively show the real magnitude of rainfall forecasted errors are used.

For mod-heavy rainfall, the North Island had an RMSE of 26.5 mm for MM (Figure 10), whilst it was only 21.9 mm for South Island (Figure 10). For each member, the RMSE of rainfall was larger than 26.9 mm over the North Island; however, it was smaller than 23.5 mm for each member over the South Island. For mod-heavy rainfall, the ME of MM was 2.2 mm over the South Island, a positive bias much smaller than the negative bias (−8.2 mm) over the North Island. The magnitude of ME was almost the same for each member and the MM. For mod-heavy rainfall, ME accounted for more than 20% of the RMSE over the North Island, but only about 10% of the RMSE over the South Island.

For heavy rainfall (Figure 11), the RMSE of the MM was 50.0 mm over the North Island, whilst it was only ~36.9 mm for the South Island. The RMSE for each member was more than 50.5 mm over the North Island, whilst it was smaller than 40.5 mm over the South Island. ME was 2.5 mm over the South Island, a bias much smaller than that (−24 mm) over the North Island. The ME of each member and the MM accounted only about 10% of the RMSE over the South Island, but about 40% of the RMSE over the North Island.

In terms of RMSE and ME, the ensemble system performed better over the South Island than over the North Island for both mod-heavy and heavy rainfall. Over the North Island, the pronounced negative bias of the simulated rainfall is a major factor leading to the worse performance of the ensemble. As described earlier, a major difference between the North Island and the South Island is the shape, height, and horizontal scale of mountains. These results indicate that mountains can significantly affect the performance of the ensemble system in moderate to heavy rainfall prediction and will be further discussed in the following section.

5. Discussion

The shape (horizontal aspect ratio and mountain height) of mountains affects the patterns and regimes of airflow past mountains [2932] and significantly affects rainfall amount and rainfall distribution (e.g., [3336]). As described earlier, the South Island has a relatively uniform mountain range (the Southern Alps), running some 600 km down the length of South Island and covering more than half its width, which the prevailing westerly airflow has to cross (Figure 1(b)). In contrast, the North Island has multiple ranges of hills and mountains giving it fewer clear-cut windward or lee side regions (Figure 1(a)). The spatial scales of the mountains of the North Island are smaller than those of the Southern Alps; as a result, a better description of mountain dynamic forcing (e.g., orographic lifting) exists for the latter in NZLAM (12 km resolution) than for the former. In addition, circulations associated with airflow past a larger mountain tend to have larger spatial scale. This leads to better description of the air flow patterns forced by the Southern Alps than those forced by the mountains of the North Island, in NZLAM. Thus, the Southern Alps having uniform shape and larger spatial scales compared to the mountains of the North Island is most likely the reason for the better performance of the ensemble for the South Island.

In New Zealand, orographic lifting plays an important role in heavy rainfall occurrence. As described earlier, large negative biases of simulated moderate to heavy rainfall were found over the North Island and accounted for 20–40% of the errors. This suggests that, for the current resolution (~12 km) of NZLAM, the orographic lifting was underestimated for the North Island. In fact, even for the South Island, relatively large RMSE and ME were found for mod-heavy and heavy rainfall as described earlier. Part of the rainfall prediction errors was due to the rainfall prediction bias, especially for heavy rainfall. Revell et al. [37] indicated that a resolution of 5 km or higher would be needed to adequately describe the vertical motion forcing of the mountains. Therefore, a higher model resolution (preferably ≤5 km) than 12 km is needed for a New Zealand operational RES system for heavy rainfall prediction.

6. Conclusion

In this study, 12 experiments using the state of the art 3Dvar and 4Dvar techniques were combined as a temporary regional ensemble system. This is the first attempt at conducting ensemble prediction of rainfall directly from a regional weather modelling system in New Zealand. The objective is to investigate the effect of data assimilation and ensemble method on moderate and heavy rainfall forecasts and the effect of mountains on the performance of a RES in New Zealand.

The RMSE, ME, and several categorical verification metrics for daily rainfall were analysed based on two thresholds, 20 mm (mod-heavy rainfall) and 50 mm (heavy rainfall). In total 630 sites in New Zealand with daily rainfall observations were used. These analyses showed that, at the same model resolution, the simple ensemble performs better than any of the 12 experiments for mod-heavy rainfall prediction. The overall better performance of the ensemble was also found for heavy rainfall. Two heavy rainfall cases showed that, in most areas with heavy rainfall, the ensemble showed a high probability of occurrence (≥0.6), due to the significant effect of mountains on heavy rainfall occurrence in New Zealand. This suggested that ensemble prediction of heavy rainfall using ensemble mean and occurrence probability would be a useful tool in New Zealand.

Under the prevailing westerly airflow for most time of a year, much rainfall occurs on the west side of the country, especially for the South Island with a steep west mountain slope that has a southwest-northeast orientation. Our analyses indicated that mountains can significantly affect the performance of this ensemble system with smaller errors (or RMSE) and bias (or ME) of forecasted mod-heavy rainfall and heavy rainfall over the South Island than over the North Island. This result is nothing new, but it indicates that a 12 km model resolution of the current temporary ensemble system is not high enough to well predict heavy rainfall in New Zealand. A ~5 km or higher model resolution is required for a better performance of an operational RES system in New Zealand for heavy rainfall prediction.

This work implies that for regional ensemble prediction of heavy rainfall in complicated mountainous areas, in addition to the initial conditions, model resolution also needs to be properly treated according to the mountain scales. For future research, a similar RES with higher model resolution (~5 km or finer) will be conducted to search for the optimum resolution over New Zealand. Beyond accounting for the uncertainties in initial conditions using data assimilation, the RES will also account for uncertainties in the lower boundary conditions (including SST, soil moisture, and vegetation cover) and the lateral boundary conditions.

Conflict of Interests

The authors declare that there is no conflict of interests regarding the publication of this paper.

Acknowledgments

This research was carried out under research collaboration SC0128 with the UK Met Office and funded by the New Zealand Foundation for Research, Science and Technology under Contract C01X081. The authors thank the anonymous reviewers for comments that have helped them improve the quality of this paper.