Research Article

Application of Optimum Compaction Energy in the Development of Bricks Made with Construction Trash Soils

Table 2

Rupture stress and fracture stress of the proposed brick and some commercial products.

MaterialRupture stress (MPa)Fracture stress (MPa)

Proposed brick (7 days)0.091.56
Proposed brick (14 days)0.162.51
Proposed brick (30 days)0.313.33
Proposed brick (60 days)0.373.81
Burned clay brick 0.453.08
Block (cement)0.205.91
“Sillar”0.012.38
Adobe0.161.32