Research Article
Cable Tension Preslack Method Construction Simulation and Engineering Application for a Prestressed Suspended Dome
Table 3
Axial force of cable-support system at tensioned state [kN].
| Cable-support system number | Original design force | Force considering position deviation | Strut | Radial rod | Hoop cable | Strut | Radial rod | Hoop cable |
| 1st hoop | −181 | 411 | 411 | 2828 | −181 | 412 | 412 | 2837 | 2nd hoop | −95 | 179 | 179 | 1293 | −95 | 179 | 179 | 1291 | 3rd hoop | −70 | 110 | 110 | 833 | −70 | 111 | 111 | 833 | 4th hoop | −84 | 131 | 131 | 425 | −84 | 132 | 132 | 426 | 5th hoop | −47 | 65 | 65 | 230 | −47 | 65 | 65 | 230 |
|
|