Research Article

An Optimal Number-Dependent Preventive Maintenance Strategy for Offshore Wind Turbine Blades Considering Logistics

Table 1

Summary of the parameter values.

Wind turbine parametersW = 1.2 MW,
Blades system /day, (meantime to damage is 29.54 days)
Cost parameters (€), (€), (€), (€), (€),  €/MW
Lead time days, day