Research Article

Aerobic Sludge Granulation in a Full-Scale Sequencing Batch Reactor

Table 1

A cycle distribution of operation time in lab-scale, pilot-scale, and full-scale SBRs.

Lab-scale SBRPilot-scale SBRFull-scale SBR

Operational cycle0–10 d11–43 d0–7 d7–50 d0–25 d25–180 d180–now
Filling (min)114040404040
Aerating (min)120180120120240240240
Settling (min)60106020604050
Discharging (min)20202020303030
Idling (min)3929040000