Research Article

Enhancing Scheduling Performance for a Wafer Fabrication Factory: The Biobjective Slack-Diversifying Nonlinear Fluctuation-Smoothing Rule

Table 4

The performances of various approaches in cycle time standard deviation.

Cycle time std. dev. (hrs)A (normal)A (hot)A (super hot)B (normal)B (hot)

FIFO5624238740
EDD13025235039
SRPT246322310630
CR6830195837
FSMCT4244233528
FSVCT319352822255
1f-TNFSMCT8143224925
1f-TNFSVCT4428183121
1f-biNFS6544194131
The proposed methodology63 23 13 40 17