Ranking of Sites for Installation of Hydropower Plant Using MLP Neural Network Trained with GA: A MADM Approach

Table 2

Numeric data for the power plant taken in the case study.

AttributesSubattributesSite 1
(Bajoli HEP, Himachal Pradesh) (180 MW)
Site 2
(Ting Ting HEP, Sikkim) (97 MW)
Site 3
(Tipaimukh HEP, Manipur)
(1500 MW)
Site 4
(Nafra HEP, Arunachal Pradesh) (96 MW)

Air qualitySO2 (µg/m3)7.16.808050
NO2 (µg/m3)4.49.08024
PM2.5 (µg/m3)4419.06021
PM10 (µg/m3)10579.010056

Water qualityPh7.307.197.57.0
DO (mg/l)9.608.812.95.0
BOD (mg/l)9.03.08.43.0
Electrical conductivity (µmhos/cm)370044.3322002350

Cost of energy deliveryCost/MW (Cr)10.424.915.437.19
Tariff rate (Rupee)5.052.224.653.55
Construction period/100 MW (Yr)5.02.57.53.0

EcologicalLand required (ha)/MW0.5220.3136.670.780
Land submerged (ha)2.01.023.52.3