Research Article

An Improved MOEA/D Based on Reference Distance for Software Project Portfolio Optimization

Table 5

Comparison of IGD-metric of MOEA/D_RD and NSGA2.

IGD-metric (NSGA2)IGD-metric (MOEA/D_RD)

-313.7932024.71
-427.488619.194
-00.0127
-00.006
--189.272324.263
--40949.7207.512
--138.696326.496
--0.0080.026
---6633.1867.3109