Research Article

Comparative Simulation Analysis of the Performance of the Logistics Manufacturing System at the Operative Level

Table 16

Prolonged manufacturing costs, intersection points.

Q_pr_ii_ at randomQ_repl_ii_ at randomQ_lfc_ii_ at randomQ_pr_ii_ heuristic_2Q_pr_i_ heuristic_1

20,5788865690989,0930769296792,18495670112401,97290374109455,0344450990989,09307692
26,2184316490989,0930769297000,84812439113236,62557449110075,3844030897000,84812439
39,8947248190989,0930769297506,87097200115260,71696492111579,77665272111579,77665272
43,9044637290989,0930769297655,23131138115854,15832244112020,84793196115854,15832244