Research Article

Comparative Simulation Analysis of the Performance of the Logistics Manufacturing System at the Operative Level

Table 2

Manufacturing times.

1,n2,n3,n4,n5,n

1,1969892,1878973,1666994,1869765,178988
1,2776792,2798873,2678894,2799875,297687
1,3999792,3889673,3889974,3668765,386788
1,4896662,4878873,4889894,4899675,498989
1,5986962,5688973,5868984,5898785,596798