Research Article

Comparative Simulation Analysis of the Performance of the Logistics Manufacturing System at the Operative Level

Table 6

Times and costs of assembling and disassembling of tools, transport of semiproducts to the key point and buffer zones, transport of charge, and transport of ready products.


6978754353
6899734453
7787634344
7866643354


6797643344
8768743354
8776934433
7766943454


9666723232
7797722321
7898921232
6688622121


8689812222
7788812232
9668822121
9696912312


6960012100
9890021200
8890012100
8980021200


6670022100
8860021200
8880012100
7770021200


9000020000
6000020000
9000020000
6000020000


0000600002
0000700002
0000700002
0000800002