Research Article

Optimal Design of the Feeder-Bus Network Based on the Transfer System

Table 2

Solution indicators under M-to-1.

Total cost ($)6474
Number of routes15
Average length per route (miles)1.02
Average frequency per route (trips/hour)22.12