Research Article
Optimal Design of the Feeder-Bus Network Based on the Transfer System
Table 2
Solution indicators under M-to-1.
| Total cost ($) | 6474 | Number of routes | 15 | Average length per route (miles) | 1.02 | Average frequency per route (trips/hour) | 22.12 |
|
|