Research Article
An Inventory Controlled Supply Chain Model Based on Improved BP Neural Network
Table 2
Comparison of training convergence rate among standard algorithm, other improved algorithms, and improved algorithm of this paper.
| Parameter depiction | Standard BP algorithm | Improved BP algorithm [26] | Improved BP algorithm [27] | Improved BP algorithm of this paper |
| Maximum iteration times | 9897 | 6245 | 4268 | 4432 | Minimum iteration times | 1456 | 841 | 985 | 756 | Average iteration times | 5423.4 | 2315.8 | 2013.9 | 1968.7 |
|
|