A Novel Dynamic Algorithm for IT Outsourcing Risk Assessment Based on Transaction Cost Theory

Table 2

Actual loss of risk factor, risk, and risk consequence in each phase (unit: 1,000 USD).

PhaseRF1RF2RF3RC1RC2RC3

11.44220.09623.0217.8465.7378.8248.97613.17714.18313.10317.274
216.58520.09637.77812.53610.18213.22418.05120.46723.72921.70129.029
345.9663.21710.5367.9289.47410.20320.41011.70434.85830.38339.715