Research Article

A Novel Approach to Study Real-Time Dynamic Optimization Analysis and Simulation of Complex Mine Logistics Transportation Hybrid System with Belt and Surge Links

Table 2

The first output result of the simulation program.

Day IDThe biggest daily capacity of bin (tons)Daily production capacity (tons)

111.344139.76
237.095817.63
398.556508.47
4309.325411.36
5167.326547.41
625.785344.06
7351.916843.42
8125.065801.39
9105.476259.13
1036.225620.90
11322.156396.39
12141.986884.21
13142.845806.76
1426.366807.03
1532.185124.21
16370.616302.12
1730.045454.35
184.825945.13
19186.814863.64
207.894848.72
2180.496478.09
2225.036014.48
2334.266234.89
24281.287428.29
25107.697031.93
26375.796333.29
2753.206021.81
28153.005734.36
2957.445555.04
3070.126338.14
31247.696571.02
3223.115609.13
3335.106044.89
3423.695810.80
35180.827357.17
3698.626070.38
3783.315997.65
38115.296554.00
3942.155248.07
40114.776270.45
41115.576406.35
42125.215323.44
4393.706007.87
4492.146461.57
4525.566548.04
4666.386353.29
4799.415588.00
48178.585592.99
4924.565594.37
5077.086117.00