Research Article
Path Planning and Vehicle Scheduling Optimization for Logistic Distribution of Hazardous Materials in Full Container Load
Table 8
Transport parameters setting in the program and CPU times.
| Stage | Parameters setting | CPU times/s | Population size | Iteration |
| Path selection | | | | Stage 1: the pulse algorithm is used to obtain the Pareto solutions of all paths from the distribution center to each destination | — | — | 17 | Stage 2: get all paths selection solution by NSGA-II algorithm | 500 | 100 | 32 |
| Vehicle scheduling | | | | The vehicle scheduling plan under the current path selection plan is acquired by UMDA | 200 | 100 | 9 |
|
|