Research Article

Evaluate the Probability of Failure in Rainfall-Induced Landslides Using a Fuzzy Point Estimate Method

Figure 11

Results of slope failure probability in different soil slopes at 0, 24, and 48 hours under rainfall conditions: (a) 0 hours in the loam slope; (b) 24 hours in the loam slope; (c) 48 hours in the loam slope; (d) 0 hours in the silt slope; (e) 24 hours in the silt slope; (f) 48 hours in the silt slope.
(a)
(b)
(c)
(d)
(e)
(f)