Research Article

Prediction of Conducted Emissions in Satellite Power Buses

Figure 14

Details of test setups used for validation. (a) dc/dc converters under unit-level testing for the identification of the input admittance in the test setup described in Figure 3(a); (b) the system-level test setup, where dc/dc converters are fed by the PCDU (in the satellite EPS) through shielded TWP cables. CE at cable ends are measured via current probes connected to an oscilloscope.
(a)
(b)