Research Article

Performance Analysis of a Three-Stream Adaptive Cycle Engine during Throttling

Table 6

Control schedule of variable geometries (group 2).

VSVRFANVSVHPCVANHPTVANLPTVABIA8A28

Subsonic100%−20°1.01.01.00.950.8
67.77%−30°−20°1.01.01.01.091.1
Supersonic100%−20°1.01.01.00.950.8
65.29%−30°−20°1.01.01.01.081.15