Research Article
SART-Type Image Reconstruction from a Limited Number of Projections with the Sparsity Constraint
Table 3
Same as Table
1 but for projection data bearing 0.1% Gaussian noise.
| View number | Scheme-AD | Scheme-BD | Scheme-CD |
| 55 | 20000 (1.5386) | 20000 (9.7042) | 20000 (1.5496) | 45 | 20000 (3.2240) | 20000 (11.4394) | 20000 (2.0746) | 35 | 20000 (5.2298) | 20000 (14.2091) | 20000 (3.7667) | 25 | 20000 (11.0959) | 20000 (16.0837) | 20000 (10.5335) |
|
|