 |
| (a) Mean imputation error |
|
 |
| (b) Box plot of prediction error |
|
 |
| (c) Variation in the number of operational nodes with time |
|
 |
| (d) Variation in the number of errors in excess of the limit with time |
|
| Figure 13: Performance of scheduling algorithms, ST LUCE dataset, two-tier network. |
|