Table 3:
Improvement in lifetime by slotted-scheduler (two-tier) and GUPTA (centralized) with respect to default network (RH LUCE).
Data Set
Algorithm
Error limit
Packet limit
Average prediction error
𝐿
1
0
0
%
𝐿
5
0
%
ST LUCE
GUPTA-2T
0.25
2150
0.61
0%
226%
ST LUCE
SS-2)
1.2
2150
0.42
226%
226%
RH-LUCE
GUPTA-2T
0.75
2150
1.1
0%
120%
RH-LUCE
SS-2T
2
2150
0.9
226%
226%