Research Article

Effects of Supply Chain Strategy on Stump Fuel Cost: A Simulation Approach

Figure 9

Cost difference between systems (I) and (II) for different values of stump harvesting site size (75–375 odt) and stump transport distance (10–150 km). A zero value indicates equally large costs.
984395.fig.009